Regulatory Compliance

Phase 2
Environmental
Site Assessments

Subsurface soil and groundwater sampling with lab-certified results — the definitive investigation when a Phase 1 ESA identifies Recognized Environmental Conditions (RECs). 10–15 day turnaround.

EPA Compliant TCEQ Closure Letters Bank & Lender Approved UST & AST Removal Lab-Certified Results Nationwide Coverage EPA Compliant TCEQ Closure Letters Bank & Lender Approved UST & AST Removal Lab-Certified Results Nationwide Coverage EPA Compliant TCEQ Closure Letters Bank & Lender Approved UST & AST Removal Lab-Certified Results Nationwide Coverage EPA Compliant TCEQ Closure Letters Bank & Lender Approved UST & AST Removal Lab-Certified Results Nationwide Coverage EPA Compliant TCEQ Closure Letters Bank & Lender Approved UST & AST Removal Lab-Certified Results Nationwide Coverage EPA Compliant TCEQ Closure Letters Bank & Lender Approved UST & AST Removal Lab-Certified Results Nationwide Coverage

Our Services

Why Compliance Matters

Failure to maintain proper stormwater controls isn’t just an environmental risk—it’s a massive financial and operational liability.

AVOID HEAVY FINDS

EPA and state penalties for non-compliance can exceed $50,000 per day. Our plans ensure you stay within the law.

}

PREVENT PROJECT DELAYS

Stop-work orders due to inadequate erosion control can derail your timeline and increase costs exponentially.

PROTECT ECOSYSTEMS

Sediment is a major water pollutant. We help you preserve local waterways and maintain a green reputation.

Not sure which service you need?

How It Works

Our 4-Step Process

Comprehensive SWPPP management from assessment to final stabilization.

Step 01

Scope & Planning

We review the Phase 1 ESA findings and RECs, then develop a site-specific sampling plan targeting the areas of greatest environmental concern.

Step 02

Field Sampling

Our field team drills at multiple site locations to collect soil borings and groundwater samples. This may range from a limited investigation to a full-scale Phase 2 study.

Step 03

Lab Analysis

Samples are chain-of-custody delivered to a state-accredited lab for analysis. Results are compared against state regulatory action levels to determine pass or fail.

Step 04

Report & Results

A final Phase 2 ESA report is prepared with all findings, lab data, and conclusions. If the property passes, your lender gets the green light to proceed with funding.

What We Do

ASTM E1903 Standard Practice

What Is a Phase 2 Environmental Assessment?

If a property has failed the Phase 1 Site Assessment due to obvious environmental risks and possible contamination, a Phase 2 Environmental Site Assessment is generally performed. This can range from a small, limited Phase 2 ESA to a full Phase 2 Environmental Study.

A full Phase 2 ESA consists of drilling the ground at several site locations to collect samples of soils and groundwater to be tested at an accredited laboratory. The scope of work is determined by the nature and severity of the RECs identified in the Phase 1 report.

Our Phase 2 assessments comply with ASTM E1903 — Standard Practice for Environmental Site Assessments: Phase II Environmental Site Assessment Process. This standard defines the requirements for investigating RECs through physical sampling and laboratory analysis.

Typical Turnaround: A Phase 2 ESA typically takes 10–15 days from start to final report delivery. Timeline may vary based on site complexity, number of sampling locations, and laboratory scheduling.

ASTM E1903 Compliant

Full compliance with the nationally recognized standard for Phase 2 ESA investigations, accepted by all major lenders.

State-Accredited Lab Testing

All samples analyzed at laboratories accredited by relevant state regulatory agencies for legally defensible results.

Chain-of-Custody Protocols

Rigorous sample handling and documentation ensuring lab results are legally defensible and regulatory-grade.

Lender-Ready Reports

Professional reports formatted for bank, SBA, and institutional lender review — with clear pass/fail conclusions.

Dependable

Trusted By Industry Leaders

CIVILCORP

SKYLINE BUILDERS

ECO-DEVELOP

METRO INFRA

NOVA CONSTRUCT

Nationwide Coverage

Ready For Site Compliance?

Get a certified SWPPP tailored to your specific project needs and local regulations. Our experts are ready to audit your site today.

Our Services

Professional Services We Provide

No hidden fees. Select the tier that best fits your property type.

ESA-1 Standard

For typical properties under 2 acres with 1–3 buildings and nominal complexity; larger, more complex properties typically start at $2,150.

Quote
  • ASTM E1527-21 Compliant Assessment
  • 5–7 Business Day Turnaround
  • Accepted by All Major Lenders & SBA
  • On-Site Property Inspection
  • Historical Use & Records Review
  • Environmental Risk Identification
  • Comprehensive Report Delivered via Email

Select Service

Phase 2 ESA

Targeted testing to confirm site contamination

Quote
  • Targeted Soil & Groundwater Sampling
  • ASTM-Compliant Investigation Protocols
  • Laboratory Analysis & Contaminant Testing
  • Defined Scope Based on Phase 1 Findings
  • Regulatory Threshold Comparison & Reporting
  • Clear Determination of Contamination Presence
  • Detailed Report with Actionable Recommendations

Select Service

Clean Up

Restore & Resolve Site Contamination

Quote
  • Phase 3 Remediation Based on Phase 2 Findings
  • Soil & Groundwater Contamination Cleanup
  • Regulatory Compliance & Agency Coordination
  • Excavation, Removal & Site Restoration
  • Risk Reduction & Liability Mitigation
  • Ongoing Monitoring & Verification Testing
  • Final Reporting & Site Closure Documentation

Select Service

we offer more

Explore Related Services

We deliver meticulous environmental assessments with honesty and precision, ensuring trust and reliability in every phase of our work.

$

Phase 1 ESA

Due diligence for property transfers.

$

Cleanup Services

Soil and water remediation experts.

$

Desktop Reports

Remote environmental risk data